We Engineered 7+ hours of Nonstop Uptime and brought operational confidence back to the Kadri Mill Floor

The Challenge

Inside the administrative block of  Kadri Mills (CBE) Ltd a spinning mill in Tamil Nadu, every hour of power mattered.

The mill relied on a 2.5kW battery paired with a 3kVA inverter—a setup meant to support their daily operations. But the backup barely lasted through routine shifts, often dipping before the 6-hour mark. This wasn’t just frustrating—it slowed everything down.

Staff had to pause tasks, delay production, and sometimes even switch to manual logs while waiting for the power to return. Coordination between the admin and production teams suffered, affecting overall efficiency.

In a fast-paced manufacturing environment, even short disruptions ripple into bigger delays.

Our Main Focus Was

At Cellex, we saw more than a technical issue—we saw a production risk hiding in plain sight.

Our main focus was to:

Design a solution that would guarantee more than 6+ hours of uninterrupted power

Eliminate the risk of downtime and restore seamless workflow

Build in long-term reliability, with minimal maintenance

Deliver a solution strong enough to earn a 5-year performance guarantee

This wasn’t just about power—it was about preserving productivity and communication

The Challenge

We replaced their existing system with a 7.2kW CELTAN lithium-ion battery, still paired with a 3kVA inverter—but upgraded to handle higher demand with better control.

The new battery was engineered for longer cycles, faster charging, and stability under fluctuating load conditions. We backed it with a 5-year Cellex performance guarantee, giving the client confidence in both product and support.

Why this solution?

  • The high-capacity battery was custom-picked for mill-grade energy cycles
  • Retaining the inverter meant no disruption to existing wiring, but a major boost in performance
  • Our 5-year guarantee reflected the system’s proven reliability and endurance

Today, the spinning mill’s admin office operates with confidence. Power stays on, production go out on time, and day-to-day coordination is seamless.

The Result

Worked for Hours

Backup extended beyond 7 hours, beating the original 6-hour goal

Power Saved

High-capacity lithium-ion reduced inefficiency and power loss

Smart Move

Long-lasting performance, low maintenance, zero disruption

Confidence Restored

Backed by a 5-year performance guarantee—peace of mind built in

Zero Maintenance

No water refills, no corrosion, no manual intervention—EASY MOBILITY