We Resized, Rewired, Recharged and doubled backup at Ortho One Hospital’s admin wing

The Challenge

In the administrative wing of Ortho One Hospital in Coimbatore, technology ran the day-to-day. From patient records to billing systems and internal coordination—everything depended on consistent power.

The team relied on a 10kVA online UPS setup that powered around 15 workstations. But despite the high rating, they were only getting 3 hours of backup. During extended outages, staff scrambled to save work, switch systems, and avoid disruptions.

They had already tried upgrading to tubular batteries. It made little difference.

In a place where delay could risk more than data, they needed a serious fix.

Our Main Focus Was

This wasn’t just another office—it was a critical arm of a healthcare system. We knew the solution had to be:

Highly reliable, with no tolerance for failure

Scalable, smart, and ready for future integrations like solar power

Easy to manage and monitor without adding to the team’s workload

Capable of delivering at least double the existing backup time

Cellex focused on giving them not just more hours—but absolute energy assurance.

The Challenge

We deployed a 4.8kW / 5kVA UPS system powered by a high-capacity lithium-ion battery, tailored to fit the admin office’s power profile and workload.

More importantly, we made it solar-ready, so the hospital could easily integrate renewable energy in the future. With an intelligent BMS and mobile app interface, their admin staff could now track performance in real time—without needing tech support.

Why this solution?

  • Lithium-ion batteries offered longer lifespan, faster charging, and zero maintenance
  • The downsized UPS (from 10kVA to 5kVA) was more efficient and cost-effective—without compromising performance
  • Smart monitoring allowed the team to focus on patients, not power issues

Now, even on days with long outages, the admin office runs confidently—with no loss of productivity, no last-minute surprises.

The Result

Worked for Hours

Backup boosted from 3 to 6.5+ hours

Power Saved

A leaner UPS system with smarter battery usage

Smart Move

Real-time visibility and solar-readiness built in

Confidence Restored

Admin operations now run reliably—even during long power cuts

Zero Maintenance

No water refills, no corrosion, no manual intervention—EASY MOBILITY

Previous Case Study

Rakesh Babulal & Co, Chartered Accountants one of Coimbatore’s well-established auditing firms,

Next Case Study

Inside the administrative block of Kadri Mills (CBE) Ltd a spinning mill in Tamil Nadu, every hour of power mattered.

Scroll to Top